Jilin Aorong New Energy Co., Ltd. Tender Announcement for the Development of a 200000t/a Lithium Battery Cathode Materials R&D Production Base (Secondary Announcement)

Tender Document Number: 2016HYJL1207 Entrusted by the tenderee Jilin AoRong New Energy Co., Ltd., the company tendered an open tender for the nickel sulphate and cobalt sulphate evaporation system project of Jilin AoRong New Energy Co., Ltd. 20000t/a lithium battery anode material R&D production base project. Potential bidders of the project come to bid. 1. Overview of Bidding Project 1.1 Basic situation of the project Jilin AoRong New Energy Co., Ltd. 20000t/a lithium battery anode material R&D and production base Project Nickel sulfate, cobalt sulfate evaporation system project, the main medium is sulfuric acid system. 1) The pH of the solution before the evaporation of nickel sulfate is 3.2 to 3.5, the content is 80 g/l, and the concentration is 360 g/l. 2) The pH value of cobalt sulfate before steaming is 2.0~2.5 content 90g/l. Concentrated content 320g/l. The overall project requires energy-saving, advanced equipment and technological processes. The bidders are responsible for the design, supply, and installation of the equipment (the civil works only provide design data). Jilin AoRong New Energy Co., Ltd. is responsible for providing relevant technical data, including raw material fluid parameters, local geological meteorological data, and public engineering conditions, etc., and is responsible for civil construction work. 1.2 Technical parameters 5000t/a nickel sulfate treatment process calculation No. Item Weight kg & volume m? Content Metal Quantity Unit Nickel Sulfate Production 5000t 22.20% t/a Nickel metal content 1110 t/a Yield 75% Finished product + seed + fabric 6667 t/a Metal input 1480 t/a Nickel sulfate monthly production 606.061 Nickel sulfate daily output 20.202 Nickel Sulfate Production 6.732 Nickel sulfate hourly output 0.842 Nickel sulfate crystallization rate 65.00% Need to spend 2276.923 t/a per year Need to put metal into month 206.993 Need to invest in metal 6.9 Need to invest in metal 2.3 Needs to put metal 0.287 hours Before steaming 85 g/l Before steaming liquid density 1.22 t/m? Concentrate to 360 g/l After steaming liquid density 1.65 ~ 1.73 t/m? Steamed liquid temperature 95 °C Steamed volume 26,787.33 m? Month 2435.212 m? Day 81.174 m? Class 27.058 m? Hours 3.382 m? Steamed volume Year 6324.786 m? Month 574.981 m? Day 19.166 m? Class 6.389 m? Hours 0.799 m? Evaporate water Year 20462.544 m? Month 1860.231 m? Day 62.008 m? Class 20.669 m? Hour 2.584 m? Mother liquor volume Year 6130.178 m? Month 557.289 m? 18.576 m? Class 1 6.192 m? Hours 0.774 m? Calculation of 3000t/a Cobalt Sulfate Treatment Process No. Item Weight kg & volume m? Content Metal Quantity Unit Cobalt sulfate production 3000 20.50% t/a Cobalt metal content 615 t/a Yield 75% Finished product + seed + fabric 4000 t/a Metal input 820 t/a Cobalt sulfate monthly production 363.636 Daily production 12.121 Class production 4.040 Hourly output 0.505 Crystallization rate 60.00% Need to put in metal 1366.667 t/a Need to put metal into month 124.242 Need to invest in metal 4.141 Need to invest in metal 1.38 It takes hours to put metal 0.173 Steamed liquid 90 g/l Before steaming liquid density 1.24 t/m? Concentrate to 320 g/l After steaming liquid density 1.6 t/m? Steamed liquid temperature 95 °C Steamed volume 15185.185 m? Month 1380.471 m? 46.016 m? Class 15.339 m? Hour 1.917 m? Steamed volume Year 4270.833 m? Month 388.258 m? 12.942 m? Class 4.314 m? Hour 0.539 m? Evaporate water Year 10914.352 m? Month 992.214 m? Day 33.074 m? Class 11.025 m? Hours 1.378 m? Mother liquor volume Year 4205.128 m? Month 382.284 m? 12.743 m? Class 4.248 m? Hours 0.531 m? 1.3 Supply and installation location: Location of the project area in Jilin Economic Development Zone. 2, source of funds Self-raised funds and funds have been implemented. 3, the scope of the tender and construction period requirements The scope of the tender: the bidder shall ensure that the equipment provided is a new product with advanced technology, mature and reliable. The bidder is responsible for the design, supply, installation and commissioning of the overall device, and is responsible for the integrity of the device; the bidder is responsible for Provide equipment layout drawings, equipment installation condition maps, and auxiliary facilities. The bid solicitor is responsible for the civil engineering design and construction work of the project according to the equipment layout drawings, equipment installation plans, and auxiliary facilities of the bid winner. All costs incurred due to changes in equipment layout, equipment installation condition diagrams, process design routes, and auxiliary facilities provided by the bid winner are all the responsibility of the bid winner. Duration: The contract is signed within 20 calendar days to complete the complete process design; equipment installation commissioning project start date According to the tender request, the bidder should complete the equipment selection and installation, installation and trial operation (ie turnkey) within 6 months. 4, bidder qualification requirements: 4.1 The bidder shall have an independent legal person qualification and have the legal qualifications for the manufacture (or distribution) of the equipment and ancillary facilities required for the bidding project approved by the relevant national competent authority; 4.2 The bidder shall have the corresponding technical strength and production scale, have the ability to design, manufacture, install, and debug evaporation systems such as nickel sulphate and cobalt sulphate (according to the relevant regulations of the national industry), and have professional secondary contracting for installation of electromechanical equipment. And above qualifications; 4.3 The bidder shall have similar project performance, have undertaken the performance of the evaporator unit similar to the scale of the project in the past five years, and have passed the test of safe operation for more than one year (provide relevant performance certification materials); 4.4 The bidder should have a sound quality assurance system, and have a good record of paying taxes and social security funds according to law; 4.5 The bidder has had a good financial and credit status in the past three years, has sufficient liquidity to undertake the project, and provided financial statements audited by an independent auditor for the past three years; 4.6 In the past three years, the bidder did not commit any unfair behavior such as winning the bid and serious breach of contract, and found no significant quality problems or effective improvement measures during the use of related equipment; 4.7 The bidder shall hold a notice letter issued by an effective procuratorial agency on the results of the search results of bribery crime files of the procuratorial organs on the basis that the bidder and his legal representatives shall not have bribery crime records within three years before participating in the bidding activity. 4.8 Two or more bidders with different company names but whose legal representative is the same natural person may not participate in the bid for the same procurement project. If this happens, the bids of the relevant bidders will be rejected. 4.9 This tender accepts consortium bids. The bid of the consortium shall meet the following requirements: The consortium leader shall be assumed by the supplier of the equipment and bear the after-sales service and maintenance. The parties to the consortium shall sign a consortium bid agreement, and the parties to the consortium shall no longer be alone or in their own name. Participate in bidding for other consortia in this bidding project. 5, access to tender documents 5.1 All bidders intending to participate in the bid are requested from December 30, 2016 to January 6, 2017 (excluding holidays and public holidays)

Posted on